Monterrey, Nuevo León Mon–Sat 10:00–18:00 (CST) (81) 4777 6921 (81) 2230 6079 info@creativeit.mx

· 5 min read

Lightning Protection Inspection: Tests, Standards and Checks

How to inspect a lightning protection system: components, continuity, earth resistance, SPDs and NMX-J-549, IEC 62305 and NOM-022-STPS standards.

Lightning Protection Inspection: Tests, Standards and Checks

A lightning protection system installed years ago and never checked since can give a false sense of security. Connections corrode, down conductors break or get disconnected during roof work, new rooftop equipment ends up outside the protected zone, and the grounding system changes with moisture and age. When lightning strikes, those details decide whether the current is carried to earth in a controlled way or finds its own path through the structure, the piping or the electrical equipment. This guide explains which standards apply in Mexico, which components are inspected, which electrical tests are performed and how to interpret the results.

Reference standards in Mexico

For the design, materials and measurement methods of lightning protection systems, the national reference is NMX-J-549-ANCE. Internationally, the IEC 62305 series is used (risk, physical damage to structures and protection of electrical and electronic systems), and in facilities with US influence, NFPA 780. On the occupational safety side, NOM-022-STPS-2015 sets conditions for workplaces where static electricity and lightning may occur, including requirements to install lightning protection in certain cases and to periodically measure the grounding system and the continuity of the system, keeping records of the results. The current edition of the standard states the minimum frequency and the cases where it applies; check it directly when setting your plant’s programme.

Technical advice and design criteria should be based on a risk assessment, such as the one described in IEC 62305-2. Not every structure needs the same level of protection.

Components of a lightning protection system

  • Air-termination system: air terminals, rooftop mesh conductors or natural metal parts of the structure that intercept the strike.
  • Down conductors: conductors that carry the current from the air terminals to earth along the most direct path possible, without sharp bends.
  • Earth-termination system: electrodes, ring or grid that dissipate the current into the soil.
  • Equipotential bonding: connections between the lightning protection system, the electrical ground, structures and metal piping to prevent dangerous potential differences and side flashes.
  • Surge protective devices (SPDs): limit surges entering through the electrical service, data or communication lines.

A complete inspection covers all five. It is common to find systems with acceptable grounding but broken down conductors, or with good air termination but no surge protection in the panels, which leaves electronic equipment exposed.

Visual inspection: what to check

  • Air terminals complete, secure and free from impact damage or corrosion.
  • Down conductors continuous, well fastened and without cut, crushed or painted-over sections that hide damage.
  • Connectors and joints tight, with no galvanic corrosion between dissimilar metals (for example, copper and aluminium without a bimetallic connector).
  • Rooftop equipment added later (air-conditioning units, antennas, solar panels, structures) that may now sit outside the protection zone or lack bonding.
  • Ground inspection pits accessible, clean and with the test joint identified.
  • SPDs with a healthy status indicator and no signs of overheating.
  • Signs of recent strikes: melting marks, burnt connectors or lightning counters showing new events.

Electrical tests

Continuity of down conductors and joints

Resistance is measured between the air termination and the earth connection point, and across each important joint, with a low-resistance ohmmeter or four-wire micro-ohmmeter. The four-wire method eliminates test lead resistance and reveals loose or corroded joints that an ordinary multimeter cannot distinguish. Rather than an absolute value, the key is comparing similar joints with each other and with previous measurements: a value much higher than the rest points to a connection that needs cleaning or remaking. Check whether the applicable standard sets a maximum value for your installation.

Earth electrode resistance

Lightning protection ground testing is normally done with the fall-of-potential (three-point) method, with the electrode disconnected at the test joint so that only that electrode is measured. Key points:

  • Place the auxiliary electrodes far enough away to be outside the influence zone of the electrode under test, and repeat the measurement while moving the potential electrode to confirm the reading is stable.
  • The clamp-on (stakeless) method only works when a parallel return path exists; on an isolated electrode it does not give a valid result.
  • The selective method measures an electrode without disconnecting it, using a clamp together with stakes.
  • Record the soil conditions: resistance varies with moisture and season, so compare measurements taken under similar conditions.

Standards set maximum earth resistance values depending on the type of installation and the current edition. Remember that low resistance alone is not enough: a well-bonded system with continuous down conductors matters as much as the ohm reading.

Checking bonding and SPDs

Verify that the lightning protection ground is bonded to the electrical system ground as required by the design and the standard, and that nearby metal piping and structures are bonded. For SPDs, check the end-of-life indicator and make sure the connection leads are short and direct, since long leads reduce their effectiveness.

When to inspect

  • Periodically, at the frequency set by the applicable standard and the plant’s maintenance programme.
  • After a confirmed strike on or near the structure.
  • After renovations, roof waterproofing or installation of rooftop equipment.
  • Before the storm season, when conditions allow safe work.

Never inspect or test a lightning protection system when a thunderstorm is present or forecast in the area.

How to document the results

The report should include a sketch of the system showing down conductors and inspection pits, the continuity and earth resistance readings with the method used, the test instrument and its calibration, soil conditions, photographs of findings and recommended corrective actions. This record supports NOM-022-STPS compliance and lets you compare trends year after year.

Common mistakes

  • Measuring the ground without disconnecting the electrode and accepting the value of the whole network as valid.
  • Using the clamp-on method on isolated electrodes.
  • Checking only the ground and forgetting down conductor and joint continuity.
  • Not updating the protection after adding rooftop equipment.
  • Leaving out SPDs in panels feeding sensitive electronic equipment.

How we can help

At CreativeIT Group we perform ground and lightning protection testing, ground resistance testing under NOM-022-STPS and soil resistivity and ground resistance studies. We also sell ground resistance testers for your own maintenance team. Contact us to schedule an inspection of your lightning protection system.

Back to the blog

Have a project or a test coming up?

Send us the details and an engineer will get back to you today.

Message us on WhatsApp